Current Truman Lake Level:733.86
Current CFS Release:45,000 cfs
Projected CFS releases and date: 45,000 cfs June 26, 2019
45,000 cfs June 27, 2019
45,000 cfs June 28, 2019
Releases from Truman Dam can change with minimal notice.
Area information: Truman outflow is matching the current inflow which results in not much change in the current level.
This will be last of the Truman Lake daily updates provided on the BC EMA website. Please visit: https://www.nwk.usace.army.mil/Locations/Water-Management/ for further updates.
Berry Bend high water ramp is the only open USACE access to Truman Lake.
All USACE camp grounds closed with the exception of a portion of the Thibaut Point camp ground.
USACE personnel continue to monitor the project and equipment as per standard operating guidelines.
The Dam is operating as designed.
Safety information:
Floating debris on the lakes is a major safety concern. Wear your pfd and be very cautious on the water.